Skip to main content

2026 Connection Fee Schedule - Approved February 5, 2026

Lost Hills Utility District 

Water and Sewer Connection Fees 

 

Water Connection Fees

Residential Properties in Lost Hills:

Single Family Dwelling                   $6,555.07

Multi-Family Dwelling, per unit    $5,384.97

Non Residential 

5/8" Meter                                        $12,949.83

3/4" Meter                                         $21,502.18

1" Meter                                              $31,754.56

1-1/2" Meter                                   $64,216.64

2" Meter                                             $102,658.39

3" Meter                                             $192,354.88

4" Meter                                             $299,138.62

Interstate 5 & Hwy 46 Properties 

Multi-Family Dwelling, per unit    $11,256.61

5/8" Meter                                        $13,948.13

3/4" Meter                                        $23,145.79

1" Meter                                             $34,185.90

1-1/2" Meter                                    $69,148.08

2" Meter                                            $110,548.02

3" Meter                                           $207,235.66

4" Meter                                           $322,150.00

Sewer Connection Fees: 

Within District Boundaries: 

1 Dwelling Unit per Lot                 $6,531.71

Each Additional Unit Per Lot      $10,143.10

Multi-Family, per Unit                     $6,531.71

All others, per EDU                           $10,143.10

Notes:  1) A  $365.00 Habitat fee per equivalent dwelling unit (EDU) shall be added to these connection fees ($352.00 x 1.036 increase 3.6 % increase)

Additional notes can be found on the document link below.

2026 LHUD Connection Fee Schedule.pdf

 Berrenda Mesa Area Rates 

Single Family                                    $9,879.90

5/8" Meter                                         $17,711.34

3/4" Meter                                         $29,455.43

1" Meter                                              $43,554.02

1-1/2" Meter                                     $88,194.15

2" Meter                                            $141,057.19

2" Meter                                            $141,057.19

2026 LHUD Connection Fee Schedule BM Area.pdf